Logo of United Vinyl Corporation - Maker of Unidex Products

Machinery

Butt Fusion Machine for HDPE Butt Fusion Pipes and Fittings Electrofusion Machine for HDPE ElectroFusion Pipes and Fittings Heat Fusion Tools for PPR Pipes and Fittings  
       

Technical Parameters for Installation using Heat Fusion Tools

Outside Diameter Welding Depth Heating Time Welding Time Cooling Time
mm mm seconds seconds seconds
20 14.0 5 4 2
25 15.0 7 4 2
32 16.5 8 6 4
40 18.0 12 6 4
50 20.0 18 6 4
63 24.0 24 8 6
75 26.0 30 8 8
90 29.0 40 8 8
110 32.5 50 10 8
Note : Heating time starts when both pipe and fitting are pushed into correct depth.
Welding time begins when joints are connected.
Cooling time is the time taken for the joints to be completely cured. Never reduce cooling time by pouring water or by other means.
 
 




Like Us on Facebook